Useful DocumentsWe have published the following documents that provide more detail on the proposed development.Digital copies of the documents are available on request by contacting our team using the details in the newsletter.Updated Line Route Report 2 Explains how the preferred line route has developed since 2015. A range of assessments were used to refine the technical line design and the temporary construction works.Updated Strategic Options Report An updated review of the need for the new 132,000 Volt electrical circuit and preferred technical design. The report includes a summary of the need case as well as consideration of other technologies.Preliminary Environmental Information Report / PEIR (Non Technical Summary) Sets out the results of initial environmental surveys and our approach to assessing potential environmental effects of the proposed development. APPENDICES:Chapter 3 The Proposed Development AppendixChapter 4 Consultation AppendicesChapter 7 LVIA AppendicesChapter 8 Ecology AppendicesChapter 9 Historic Environment AppendicesChapter 10 Hydrology AppendicesChapter 11 SocioEconomic AppendicesFIGURES:Chapter 1 Introductory FiguresChapter 4 Consultation FiguresChapter 7 LVIA Figure 7.6 Public AccessChapter 7 LVIA Figure 7.7 Residential AmenityChapter 7 LVIA Figure 7.8 Viewpoint LocationsChapter 7 LVIA Figures 7.1 - 7.5Chapter 8 Ecology Figure 8.11 Reptile Habitat SuitabilityChapter 8 Ecology Figures 8.1 - 8.3Chapter 8 Ecology Figures 8.4 - 8.10Chapter 9 Historic Environment FiguresChapter 10 Hydrology FiguresChapter 11 SocioEconomic FiguresChapter 12 Land Use FiguresMaps - Works Plans 1:2, 500 plans showing the proposed development.Statement of Community Consultation Sets out how we’re undertaking this statutory consultation