North Argyll Tie-InThe proposed North Argyll Tie-In is located approximately 1km south of Dalmally in Argyll and Bute. SP Energy Networks (SPEN) have a licence obligation to provide electricity generators with a connection to the electricity system in this area and, in line with this, is proposing to construct 0.6 km of temporary overhead line (OHL) supported on two temporary masts and one permanent steel lattice tower which will form part of the existing OHL known as ‘YW route’ between Dalmally and Windyhill. This Project is proposed in tandem with an OHL proposal by Scottish and Southern Electricity Networks Transmission (SSEN Transmission) which proposes construction and operation of a 13.3km OHL supported on steel lattice towers between the proposed Creag Dhubh Substation and the existing SPEN 275kV OHL. The Scottish Power Transmission terminal tower will facilitate connection of the new SSEN OHL to the transmission network. North Argyll Tie-In Section 37 Application Documents Volume 1- Non Technical SummaryNorth-Argyll Tie-In-Volume 1-Non Technical SummaryVolume 2- Main ReportNorth-Argyll Tie-In- Volume 2- Chapter 1- IntroductionNorth-Argyll Tie-In-Volume 2-Chapter 2-Description of the Proposed DevelopmentNorth-Argyll-Tie-In-Volume 2-Chapter 3-Consideration of AlternativesNorth-Argyll Tie-In-Volume 2-Chapter 4-EIA Consultation and Scope North-Argyll Tie-In-Volume 2-Chapter 5-MethodologyNorth-Argyll Tie-In-Volume 2-Chapter 6-Biodiversity North-Argyll Tie-In-Volume 2-Chapter 7- OrnithologyNorth-Argyll Tie-In-Volume 2-Chapter 8-Landscape and Visual ImpactNorth-Argyll Tie-In-Volume 2-Chapter 9-Cultural Heritage and ArchaeologyNorth-Argyll Tie-In-Volume 2-Chapter 10-Hydrology,Hydrogeology,Geology and SoilsNorth-Argyll Tie-In-Volume 2-Chapter 11-ForestryNorth-Argyll Tie-In-Volume 2-Chapter 12-Noise and VibrationNorth-Argyll Tie-In-Volume 2-Chapter 13-Traffic and TransportNorth-Argyll Tie-In-Volume 2-Chapter 14-Cumulative AssessmentNorth-Argyll Tie-In-Volume 2-Chapter 15-Schedule of Environmental MitigationVolume 3a- EIA FiguresNorth-Argyll Tie-In-Volume 3a-Figure 1.1-Location Plan and OverviewNorth-Argyll Tie-In-Volume 3a-Figure 2.1-a-j Proposed Development-Overhead Line Alignment and Access RoutesNorth-Argyll Tie-In-Volume 3a-Figure 2.2-a.j Land Take and Forestry RemovalNorth-Argyll Tie-In-Volume 3a-Figure 3.1-LT29 Routing OptionsNorth-Argyll Tie-In-Volume 3a-Figure 3.2-Baseline Alignment with All Deviation OptionsNorth-Argyll Tie-In-Volume 3a-Figure 3.3-LT29 Tie In OptionsNorth-Argyll Tie-In-Volume 3a-Figure 6.2-Phase 1 HabitatsNorth-Argyll Tie-In-Volume 3a-Figure 6.3-NVCNorth-Argyll Tie-In-Volume 3a-Figure 6.4-Target NotesNorth-Argyll Tie-In-Volume 3a-Figure 6.6-Ground Water Dependent Terrestrial Ecosystem (GWDTE)North-Argyll Tie-In-Volume 3a-Figure 7.1-Ornithology-Designated SitesNorth-Argyll Tie-In-Volume 3a-Figure 7.2 -Ornithology-Survey LocationsNorth-Argyll Tie-In-Volume 3a-Figure 7.3-Ornithology 2016-17 Survey ResultsNorth-Argyll Tie-In-Volume 3a-Figure 7.4-Ornithology 2019-20 Survey ResultsNorth-Argyll Tie-In-Volume 3a-Figure 8.1a-ZTV and Study Area-Standard Tower HeightsNorth-Argyll Tie-In-Volume 3a-Figure 8.1b-ZTV and Study Area-Actual Tower Heights plus 20% LODNorth-Argyll Tie-In-Volume 3a-Figure 8.2-TopographyNorth-Argyll Tie-In-Volume 3a-Figure 8.3a-Landscape CharacterNorth-Argyll Tie-In-Volume 3a-Figure 8.3b-Landscape Character with ZTV-Standard Tower HeightNorth-Argyll Tie-In-Volume 3a-Figure 8.3c-Landscape Character AssessmentNorth-Argyll Tie-In-Volume 3a-Figure 8.4a-Landscape DesignationsNorth-Argyll Tie-In-Volume 3a-Figure 8.4b-Landscape Designations with ZTVNorth-Argyll Tie-In-Volume 3a-Figure 8.4c-Landscape Designations with ZTVNorth-Argyll Tie-In-Volume 3a-Figure 8.5a-Visual Receptors with ZTVNorth-Argyll Tie-In-Volume 3a-Figure 8.5b-Visual Receptors with ZTVNorth-Argyll Tie-In-Volume 3a-Figure 8.6-Viewpoint LocationsNorth-Argyll Tie-In-Volume 3a-Figure 8.7-Cumulative ZTVNorth-Argyll Tie-In-Volume 3a-Figure 9.1-Cultural Heritage Inner Study AreaNorth-Argyll Tie-In-Volume 3a-Figure 9.2-Cultural Heritage Outer Study Area North-Argyll Tie-In-Volume 3a-Figure 9.3-Cultural Heritage Outer Study AreaNorth-Argyll Tie-In-Volume 3a-Figure 10.1-Hydrology, Hydrogeology, Geology and Soils Study AreaNorth-Argyll Tie-In-Volume 3a-Figure 10.2-Peat DepthNorth-Argyll Tie-In-Volume 3a-Figure 10.3-Surface Water FeaturesNorth-Argyll Tie-In-Volume 3a-Figure 10.4-Superficial GeologyNorth-Argyll Tie-In-Volume 3a-Figure 10.5-Bedrock GeologyNorth-Argyll Tie-In-Volume 3a-Figure 10.6-HydrogeologyNorth-Argyll Tie-In-Volume 3a-Figure 10.7-Water ResourcesNorth-Argyll Tie-In-Volume 3a-Figure 10.8-Soils Map of ScotlandNorth-Argyll Tie-In-Volume 3a-Figure 11.1-Landownership Boundaries MapNorth-Argyll Tie-In-Volume 3a-Figure 11.4-Forestry Project Felling MapsNorth-Argyll Tie-In-Volume 3a-Figure 11.5-Location and LandscapeNorth-Argyll Tie-In-Volume 3a-Figure 11.6-Selected Forests North-Argyll Tie-In-Volume 3a-Figure 12.1-Noise Sensitive Receptors and Noise Measurement LocationsNorth-Argyll Tie-In-Volume 3a-Figure 12.2-Operational Noise MappingNorth-Argyll Tie-In-Volume 3a-Figure 13.1-Traffic and Transport Study AreaNorth-Argyll Tie-In-Volume 3a-Figure 14.1-Cumulative Developments Volume 3b-EIA VisualisationsNorth-Argyll Tie-In-Volume 3b-Figure 8.8b-Viewpoint 2-A85 at Dalmally Post Office North-Argyll Tie-In-Volume 3b-Figure 8.8c-Viewpoint 3-StronmilchanNorth-Argyll Tie-In-Volume 3b-Figure 8.8d-Viewpoint 4-Kilchurn CastleNorth-Argyll Tie-In-Volume 3b-Figure 8.8e-Viewpoint 5-A85 by B8077 JunctionNorth-Argyll Tie-In-Volume 3b-Figure 8.8f-Viewpoint 6-Lochawe HotelNorth-Argyll Tie-In-Volume 3b-Figure 8.8g-Viewpoint 7-Monadh Driseig (Hill Top)North-Argyll Tie-In-Volume 3b-Figure-8.8h-Viewpoint 8-A85 LaybyNorth-Argyll Tie-In-Volume 3b-Figure 8.8i-Viewpoint 9-Fraoch EilanNorth-Argyll Tie-In-Volume 3b-Figure 8.8j-Viewpoint 10-A819 LaybyNorth-Argyll Tie-In-Volume 3b-Figure-8.8k-Viewpoint 11-Duncan ban McIntyre MonumentNorth-Argyll Tie-In-Volume 3b-Figure 8.8l-Viewpoint 12-Cruachan Path by DamNorth-Argyll Tie-In-Volume 3b-Figure 8.8m-Viewpoint 13-Cruachan Visitor CentreNorth-Argyll Tie-In-Volume 3b-Figure 8.8n-Viewpoint 14-Ardanaiseig House GDLNorth-Argyll Tie-In-Volume 3b-Figure 8.8o-Viewpoint 15-TaychregganNorth-Argyll Tie-In-Volume 3b-Figure 8.8p-Viewpoint 16-FernochNorth-Argyll Tie-In-Volume 3b-Figure 8.8q-Viewpoint 17-Beil Munro MonumentNorth-Argyll Tie-In-Volume 3b-Figure 8.8r-Viewpoint 18-A819North-Argyll Tie-In-Volume 3b-Figure-8.8s-Viewpoint 19-Cladich SteadingNorth-Argyll Tie-In-Volume 3b-Figure 8.8.2b-8.8.6c-Residential Visual Amenity AssessmentNorth-Argyll Tie-In-Volume 3b-Figure 9.4_9.9 Site and Cultural Heritage MapNorth-Argyll Tie-In-Volume 3b-Figure 9.10_9.16-Tom a’Chaistel Dun, Teatle WaterVolume 4-EIA Technical AppendicesNorth-Argyll Tie-In-S37-EIA Volume 4-Technical Appendix 11.1h-Overhead Line Woodland Reports Fig 11.11 Proposed Power Line FellingNorth-Argyll Tie-In-S37-EIA Volume 4-Technical Appendix 8.1-LVIA-GlossaryNorth-Argyll Tie-In-S37-EIA Volume 4-Technical Appendix 4.3-Consultation RegisterNorth-Argyll Tie-In-S37-EIA Volume 4-Fig 10.8.1-Superficial GeologyNorth-Argyll Tie-In-S37-EIA Volume 4-Technical 11.1h Overhead Line Woodland Reports Figure 11.9 Keppochan East- Tullich North-Argyll Tie-In-S37-EIA Volume 4-Technical Appendix-2.1-Tower ScheduleNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix-2.2-Outline Construction Environmental Management PlanNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 2.3-General Environmental Management PlanNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 2.4-Badger Species Protection PlanNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 3.1- Report on ConsultationNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 3.1-Report on ConsultationNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 4.1-Scoping ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 4.2-Energy Consents Unit Scoping OpinionNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 6.1-Biodiversity Methodology and ResultsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 6.3-Outline Habitat Management PlanNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 7.1-Ornithology Methods and ResultsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 8.2-Landscape North-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 8.3-Landscape Designations and ClassificationsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 8.4-Residual Effects on Landscape CharacterNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 8.5-Residual Effects on LandscapeNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 8.6- Viewpoint AssessmentNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 8.7-Wild Land Impact Assessment North-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 8.8- Residential Visual Amenity AssessmentNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 9.1-Cultural Heritage Assets-Inner Study AreaNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 9.2-Cultural Heritage Assets-Outer Study AreaNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 9.3-Cultural Heritage-VisualisationsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.1-Peat Survey Results Report North-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.2-Outline Peat Management PlanNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.3-Part 1 Peat Landslide Hazard and Risk Assessment North-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.3-Part 2a-Appendix A-FiguresNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.3-Part 2b-Peat Landslide Hazard and Risk Peat DepthNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.3-Part 2c- Peat Landslide Hazard and RiskNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.3-Part 2d-Peat Landslide Hazard and RiskNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.4- Part 1-Watercourse crossing AssessmentNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.4 Part 2a-Proposal with Watercourse CrossingsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.4-Part 2b-Proposal with Watercourse CrossingNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.5-Private Water Supplies AssessmentNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.6-Forestry Hydrology AssessmentNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.7-SEPA Consultation Meeting MinutesNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 10.8- GWDTE AssessmentNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1a-Overhead Line (OHL) Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1b-Optimised OHL Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1c-Overhead Line (OHL) Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1d-Optimized OHL Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1e-OHL Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1f-OHL Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1g-OHL Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1h-Overhead Line Woodland Reports Fig 11.7 Keppochan East and Tullich Location and ContextNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1h-Overhead Line Woodland Reports Fig 11.8 Keppochan East and Tullich Current Tree CoverNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1h-Overhead Line Woodland Reports Fig 11.12 Proposed Powerline RestockNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.1h-Overhead Line Woodland Reports Fig 11.10 Layout of CropsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.2-Native Woodland Management Strategy North-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.3- Woodland Planting Management StrategyNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 12.1- Acoustics GlossaryNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 12.2-Operational Noise ResultsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix Fig10.8.2-Solid GeologyNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix Fig10.8.3-HydrogeologyNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix Fig10.8.4-Surface WaterNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix Fig10.8.5-Groundwater Dependent Terrestrial EcosystemsNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix Fig.10.8.6-Groundwater Dependency North-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.h-OHL Woodland ReportNorth-Argyll Tie-In-S37-EIA Volume 4- Technical Appendix 11.i-OHL Woodland ReportOther Documents:North-Argyll Tie-In-EIA Cover Pages North-Argyll Tie-In-EIA Glossary and ContentsNorth-Argyll Tie-In-PAC Report on Consultation Nov 2020North-Argyll Tie-In-PAC Report on Consultation Nov 2021North-Argyll Tie-In-Planning StatementNorth-Argyll Tie-In-Schedule of Environmental MitigationNorth-Argyll Tie-In-Location PlanNorth-Argyll Tie-In-Covering LetterNorth-Argyll-SPEN Location Plan