We’ve outlined below typical costs and timescales for the most common types of service alteration. Click on the quote or estimate links to go directly to that form.
Moving a single meter and Connection point
If you want to move your existing connection point and meter to a new location, SP Energy Networks is here to help.
Guide Time to Connect:
42 days
Guide price based on alteration of one connection point.
Click here to download an offline PDF application form that you can email or post to us
Moving multiple meters and connection points
If you want to move your existing connection point and meter to a new location, SP Energy Networks is here to help.
Guide Time to Connect:
42 days
Guide price based on 2 to 4 alterations to various connection points
Click here to download an offline PDF application form that you can email or post to us