FITNESS (Future Intelligent Transmission Network Substation) aims to deliver an efficient and effective digital substation of the future for a new energy landscape.

Timescale

April 2016 – April 2020

Project Status

Completed

About the Project

About the Project

Its use of digital technology offers a range of significant benefits to both customers and operators, from improved safety to lower costs.

The goal of FITNESS is to enable GB Transmission Owners (TOs) and Distribution Network Operators (DNOs) to apply a digital substation design approach to future load and non-load related investment. Digital substations are based on concepts of standardisation and interoperability, and enable replacement of many kilometres of copper wiring with digital measurements over a cost effective fibre communications network.

FITNESS provides much greater flexibility in building, instrumenting, maintaining, modernising and controlling future substations.

Objectives

Project Objectives

  • Digital Communications - Digital substations are designed with digital communications over fibre optic links instead of analogue signals over copper wires from switchyard to control building. The method relies on the recent International Electrotechnical Commission (IEC) 61850 9 2 ‘Process Bus’ standard for publishing digital SVs. The project trials the fitness-for-purpose of the standard and interoperability of products and integrated systems designed to this standard.
  • Measurement - The process bus standard enables integration of smaller, lighter and higher quality sensors. The project is intended to prove that NCITs can be integrated with protection, monitoring and control, and that the data quality is sufficient to fulfil the functions of multiple conventional transformers, while reducing footprint and using environmentally benign materials. Trials include substation NCITs fulfilling protection needs (with a voltage NCIT released in 2015), novel distributed sensors applicable to hybrid overhead/underground lines. It has been trialled by remote and local measurements integrated using IEC 61850 9-2,and conventional transformers via merging units to achieve a practical roadmap for introducing the process bus architecture.
  • Protection - With only digital communications and no analogue hardwiring, protection devices are smaller and can be replaced or reconfigured without any changes to wiring in the switchyard, avoiding circuit outages. The reliability and availability of protection in the new architecture in a live substation is a key outcome, as is the interoperability between multi-vendor protections based on IEC 61850-8-1 and 9-2 standards.
  • Control - Substation control processes applied in the IEC 61850-8-1 based substation design.
  • Substation management - The project intends to prove that multi-vendor equipment is interoperable and can be managed in an integrated system and is cyber secure.

Benefits

The Benefits

  • Lower substation build and modernisation cost. There will be a 10% reduction of substation new-build and replacement costs.
  • Reduced outage time and constraints.
  • Improved safety for both our customers and members of staff.
  • Reduced environmental impact. FITNESS will represent carbon savings through reduction in constraints for the connection of renewable generation and the reduced use of copper in substations.
  • Improved customer service as FITNESS will lead to a 4-5% reduction of constraint payments through reduced outage requirements.
  • Greater operational flexibility leading to more efficient use of assets.

Partners

Project Partners

Project Partners

ABB Ltd,  GE Ltd, Synaptec, Omicron Electronics.

Academic Partners

The University of Manchester.

Project Supporters

NGET, SSEN.