This application provides an indication of the potential opportunities to connect Distributed Generation (DG) to the 11kV, 33kV and 132kV network in the SP Manweb plc licence area (Cheshire, Merseyside, N.Shropshire, N.Wales).
Each substation and circuit have been assigned one of the following categories:
Category | Description |
Green | All operational factors are within tolerable limits and so opportunities may exist to connect additional Distributed Generation without reinforcing the network (subject to detailed studies). |
Amber | At least one factor is nearing its operational limit and hence, depending on the nature of the application, network reinforcement may be required. However, this can only be confirmed by detailed network analysis. |
Red | At least one factor is close to its operational limit and so installation of most levels of Distributed Generation and a local connection is highly unlikely. It may also require extensive reinforcement works or given the lack of a local connection, require an extensive amount of sole user assets to facilitate such a connection. |
Whilst all reasonable care has been taken in the preparation of the information and data presented within these pages, SP Energy Networks is not responsible for any loss that may be attributed to the use of the data.
By clicking 'OK', you acknowledge that you have read and understood the information provided above.
OK